Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang
DOI:
https://doi.org/10.21776/ub.rekayasasipil.2017.011.01.7Keywords:
Curve-S, Earned Value, Tracking, Recommended Monitoring MethodAbstract
Curve-S, Earned Value, and Tracking. The results of the analysis using the curve method S, week 1 to 6 project acceleration took place, while at week 17, 18, and 19 projects too late. At week 20 the work is accelerated until the last week of the 22nd week, and the duration of the last project is 22 weeks. The result of analysis using Earned Value method, week 17,18,19 late, and other week happened acceleration. Cost deviations occur in weeks 1-4,6,7,15,16,17, and 18. To estimate the final cost of the total final cost, and the prediction for the total project completion time is 22 weeks. The analysis result using tracking shows that the actual duration is 158 days, and the estimated duration is 2 calendar days. The project prediction is completed on January 28, 2017. The total cost incurred is less than the final project cost plan. So the recommendation of the appropriate monitoring method for the People's Market is Tracking.ÂDownloads
Published
2017-07-31
How to Cite
Andardi, F. R., Wisnumurti, W., & Suharyanto, A. (2017). Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang. Rekayasa Sipil, 11(1), pp.49–56. https://doi.org/10.21776/ub.rekayasasipil.2017.011.01.7
Issue
Section
Articles
License
Copyright (c) 2017 Rekayasa Sipil
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This journal is licensed under a Creative Commons Attribution 4.0 International License