Rekayasa Sipil https://rekayasasipil.ub.ac.id/index.php/rs <p><strong>E-ISSN : 2502-6348</strong> |<strong>P-ISSN : 1978-5658 |DOI prefix : 10.21776/ub.rekayasasipil</strong></p> <p>Welcome to <strong>Rekayasa Sipil</strong>.</p> <p><strong>Rekayasa Sipil</strong> is an open-access peer-reviewed journal that mediates the result of the study, research, and development of science and technology in Civil Engineering with scope of Structural Mechanic, Construction Management, Material, Transportation, Water Resources, and also Geotechnical Engineering. We cover case study, scientific research, and literature review papers.</p> <p>Author may write an article in accordance with Author Guideline and submit the article online by using OJS system. We accept articles in <strong>English</strong> only. The authors should follow <strong>Author Guideline</strong> in writing an article. The submitted articles should never been published elsewhere and the authors are forbidden to do double-submission in other journals.</p> <p>Rekayasa Sipil is published three times in a year : February, June and October. Starting in 2023, Rekayasa Sipil published 15 papers for each issue.</p> <p>Since September 2017 we have been a proud member of <a href="https://search.crossref.org/?from_ui=yes&amp;q=rekayasa+sipil&amp;page=3"><strong>CROSSREF</strong></a>. <strong>Rekayasa Sipil</strong> <strong>DOI</strong> <strong>prefix is </strong><strong>10.21776</strong>. Therefore, all articles published by <strong>Rekayasa Sipil </strong>will have a unique <strong>DOI number.</strong></p> <p><strong>Rekayasa Sipil </strong>has been indexed in <strong>Directory Open Access Journal (<a href="https://doaj.org/toc/2502-6348?source=%7B%22query%22%3A%7B%22bool%22%3A%7B%22must%22%3A%5B%7B%22terms%22%3A%7B%22index.issn.exact%22%3A%5B%221978-5658%22%2C%222502-6348%22%5D%7D%7D%5D%7D%7D%2C%22size%22%3A100%2C%22sort%22%3A%5B%7B%22created_date%22%3A%7B%22order%22%3A%22desc%22%7D%7D%5D%2C%22_source%22%3A%7B%7D%2C%22track_total_hits%22%3Atrue%7D">DOAJ</a>, <a href="https://scholar.google.co.id/citations?hl=en&amp;user=c3F3fIgAAAAJ&amp;view_op=list_works&amp;sortby=pubdate">GOOGLE SCHOLAR</a>, IPI, SINTA,</strong> and <strong>ONESEARCH</strong>) and also nationally <strong>accredited as</strong> <strong>S3</strong> by the Ministry of Research, Technology, and Higher Education of the Republic of Indonesia (Decree No. <strong>30/E/KPT/2019 on November <strong>11th,</strong> 2019) </strong></p> en-US <p><a href="http://creativecommons.org/licenses/by/4.0/" rel="license"><img src="https://i.creativecommons.org/l/by/4.0/88x31.png" alt="Creative Commons License" /></a><br />This journal is licensed under a <a href="http://creativecommons.org/licenses/by/4.0/" rel="license">Creative Commons Attribution 4.0 International License</a></p> rekayasasipil@ub.ac.id (Ari Wibowo) lilya_st@ub.ac.id (Dr.Eng. Lilya Susanti) Tue, 01 Aug 2023 03:02:18 +0000 OJS 3.2.1.4 http://blogs.law.harvard.edu/tech/rss 60 Evaluation of Project Work in a Public Service Building in East Java https://rekayasasipil.ub.ac.id/index.php/rs/article/view/886 <p>In the process of implementing a project, few people find projects that go according to plan. In general, there are projects that are behind schedule, both in terms of time and schedule, but there are also projects that experience acceleration from the originally planned schedule. Project delay is a problem that arises as a result of unplanned construction implementation. Damage to the state due to additional costs and delays is one of the impacts of project delays. The purpose of this research is to track project implementation, identify factors that cause delays, calculate the cost of delays that occur, find root causes and suggest alternative solutions that can be used to anticipate project delays. Monitoring and evaluating delays require an approach that includes the use of Microsoft Project Tracking, Fishbone Charts, and Root Cause Analysis. Alternative methods are used to track performance and analyze delays in public service building projects. The results showed a lack of understanding of human resources in terms of planning/evaluating existing plans, lack of training programs related to the field of work being handled, and poor schedule planning causing a lack of lightning rods, installation in the main building, lighting in changing rooms, grounding systems, central duct/airline, less power cables than needed and original water source using PAM water converted into deep pumping wells.</p> Andhika Dwi Kurniawan, Arief Rachmansyah, Yatnanta Padma Devia Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/886 Tue, 01 Aug 2023 00:00:00 +0000 Analisis Kinerja Struktur Gedung Bertingkat Menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) pada Pembangunan Rumah Susun Cakung Jakarta Timur https://rekayasasipil.ub.ac.id/index.php/rs/article/view/970 <p>Analysis of the structural performance of the Cakung house in East Jakarta aims to determine the behavior and performance of the building by using the Special Moment Bearing Frame system (SRPMK). Evaluation is carried out on the performance of the building structure by using a structural analysis aid program. And the lateral force capacity that the system can withstand is 1592432.05 Kgf in the X direction and 643948.61 Kgf in the Y direction. Where the pushover analysis using the ATC 40 method, the melting point occurred for the first time at a displacement of 23.57 cm in the X direction and 7.28 cm in the Y direction. And serious damage occurred at the displacement of 77.49 cm in the X direction and 94.84 in the Y direction. The analysis found that the drift ratio value of the maximum total deviation and the maximum inelastic deviation that occurs in the structure is less than 1%. So that the level of performance of the design is in the category of Immediate Occupancy (IO).</p> Hesty Auliya Dewi, Erno Widayanto, Ketut Aswatama Wiswamitra Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/970 Tue, 01 Aug 2023 00:00:00 +0000 Perbandingan Nilai Simpangan Horizontal yang Menggunakan Bresing Tipe Diagonal dengan Inverted V dalam Menahan Gaya Lateral pada Studi Kasus Hotel Loji Kridanggo Boyolali https://rekayasasipil.ub.ac.id/index.php/rs/article/view/973 <p>Application of a bracing skeletal system is an additional steel structure that can strengthen a column by transferring weights and force to the received column. The broad use of flensa steel bracing type v diagonally and inverted gradually on each floor. It is possible to determine the junction of the junction if the building is brewed and not braced. The junction to cross section of the building does not use bracing, which USES bracing type v diagonal and inverted is 0.385:0.321:0.294. Bracing inverted type v is more rigid and sturdy than bracing diagonal types shown by the deviation of horizontal bracing the inverted type v smallest and volume 12.5 percent greater than bracing the type diagonal.</p> Ratu Adila, Erno Widayanto, Ketut Aswatama Wiswamitra Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/973 Tue, 01 Aug 2023 00:00:00 +0000 Analisis Kinerja Biaya dan Waktu dengan Metode Earned Value pada Proyek Transportasi Bandar Udara https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1000 <p>The Ministry of Transportation plans to build 16 national strategic airports by 2021. The airports to be built are spread from Sumatra to Papua with a total budget of IDR 1.6 trillion. Projects that are complex and dynamic in their implementation have caused many projects not to go according to plan. Both in terms of time, cost and labor. For this reason, it is necessary to have a consistent and integrated control mechanism for project performance. Earned Value Management (EVM) is one of the appropriate project management techniques used to compare actual work performance against project plans. Outline of project control can identify such as: Time and Schedule ; Is the time used to be longer or faster than the original plan? then, Budget and Costs; Does the budget used exceed the initial budget that has been determined or not, and Performance; Does performance lead to real productivity at the time of reporting? The results of the study explain that in weeks 9 to 12 the SPI value &lt; 1 which indicates that the project is experiencing delays, and starts on schedule in week 13 and accelerates in week 14 while in weeks 15 and 16 it experiences delays again because the value SPI &lt; 1 and back on schedule in week 17. Meanwhile, based on the value of the Cost Performance Index (CPI) only in week 11, the value of CPI &lt; 1 shows that the actual costs incurred are greater than the completion of the volume of work, resulting in cost overruns). and the amount of money needed to complete the rest of the work is Rp. 1,519,229,597.61 with a total project cost of Rp. 6,779,248,539.11 and the estimated time for completion of this project is 22 weeks.</p> Isfan Dina, Budi Susetyo, Agus Suroso Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1000 Tue, 01 Aug 2023 00:00:00 +0000 Analisis Produktivitas Alat Berat dan Pekerja di Pekerjaan Pengecoran Lantai Spillway pada Proyek Pembangunan Bendungan https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1013 <p>Productivity is one of the keys to determining the factors that affect competitiveness in construction projects, including the productivity of workers and heavy equipment for spillway casting work at Dam Development. The aim of the research is to analyze productivity and factors affecting heavy equipment and workers. This research using quantitative descriptive calculation methods, and observation in field time study. The results of the data calculations show that the productivity value of a concrete pump is 167.491 m3/day, the productivity of mixer trucks is 46.305 m3/day/unit, and the productivity of workers is 13.790 m3/day/person. Factors that affect heavy equipment productivity are weather, work time efficiency, and material or payload. As well as factors that affect worker productivity, there are the weather, worker time efficiency, foundry location, and the number of workers.</p> Mery Komalasari, Dinda Fardila, Dedy Dharmawansyah, Eti Kurniati Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1013 Tue, 01 Aug 2023 00:00:00 +0000 Analisis Faktor Penyebab Contract Change Order dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi Jalan dan Jembatan https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1020 <p>The Contract Change Order problems in construction projects significantly influence the project’s success. Therefore, analysis related to the factors causing the occurrence of CCO and its effect on the implementation of construction projects is expected to be used as a reference by related parties for future project implementation. This research used quantitative and descriptive methods to find out which factors caused CCO and their effects. The study was carried out on one road acceleration project in NTB Province with the owners, consultants, and contractors who were respondents to this research. There are 14 variables in the causative factor of CCO and two variables in the influence that occurs. "Additional Needs for Functional and Maintenance" becomes the dominant causative factor, and "Cost Overruns" becomes the variable with the highest effects.</p> Dinda Fardila, M. Syarif Afandy, Eti Kurniati Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1020 Tue, 01 Aug 2023 00:00:00 +0000 Evaluasi Perilaku dan Kinerja Struktur Gedung Pelayanan Medis Rumah Sakit RKZ Surabaya Dengan SNI 1726:2019 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1031 <p>Updating regulations from SNI 1726 – 2012 to SNI 1726 – 2019 allows evaluation of the behavior and performance of building structures to reduce the risks posed by earthquakes. This is necessary because in SNI 1726-2019 there is an additional long period in the spectrum response so it is necessary to evaluate it to ensure that the building structure whose behavior still meets the requirements in the regulation. The method used in this study was the pushover analysis method. This study evaluates the St. Catholic Hospital Medical Services building. Vincent a. Paul (RKZ) Surabaya. This study discusses building analysis based on SNI 1726 - 2019 to determine the behavior and performance of structures. The results of this study indicate that the behavior of the structure which includes the time period, base shear force, drift ratio, dual system control meets the requirements in accordance with SNI 1726-2019. This performance level is included in the LS (Life Safety) category.</p> heri istiono, Madaret Rifqi Dzakwan Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1031 Tue, 01 Aug 2023 00:00:00 +0000 Analisis Jaringan Pipa Distribusi Air Baku WTP1 Waduk Gongseng Kabupaten Bojonegoro Provinsi Jawa Timur Menggunakan Qepanet https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1034 <p>The WTP 1 service area is planned to meet raw water needs in the Temayang and Sukosewu Districts with a raw water supply of 150 l/s. The research objective is to plan a pipeline network to help the people of Temayang and Sukosewu Districts meet their clean water needs. The pipeline network is planned using the QEpanet application to make it easier to describe the network and find out the elevation and length of the pipes. Hydraulic simulation using the Epanet application with the calculation of energy loss using the Hazen William method. The projected population is calculated using the arithmetic method. The pipeline network is planned to use pipes with a diameter of 76.2 – 406.4 mm. The pump is placed in WTP1 with a capacity of 150 l/s and a pump head of 130 m. From the results of the Epanet 2.2 hydraulic simulation on the Junc J22 branch, the pressure value is 1.19 m. so a pump is needed on the L22 pipe section.</p> yulia indriani Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1034 Tue, 01 Aug 2023 00:00:00 +0000 Penyusunan Peta Koefisien Amplifikasi Berdasarkan Rasio Spektra Percepatan https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1045 <p>One of the most important parameters in the building structure design process is an amplification coefficient. The amplification coefficient is needed to propagate a spectra acceleration at bedrock to soil surface. The amplification coefficient can be determined by several methods such as MASW Method, HVSR Method and other methods. One alternative method that can be used in determining the amplification coefficient is to determine the ratio between the ground acceleration at the surface and at the bedrock. Therefore, the purpose of this study was to identify the amplification coefficient in the Province of the Special Region of Yogyakarta with the PSHA method analysis approach by utilizing the shear wave velocity data (Vs30). This research method was carried out in 3 stages, namely data collection, acceleration analysis using the PSHA method, and determination of the amplification coefficient based on the acceleration ratio. The results of the study obtained a distribution of the amplification coefficient of the acceleration spectra of 0.2 and 1 second in the DIY province with a maximum value of <em>F<sub>a</sub></em> amplification coefficient was 1.414 on hard soil conditions and 1.653 on medium soil conditions. The maximum <em>F<sub>v</sub></em> amplification coefficient was 1.508 on hard soil conditions and 1,923 on medium soil conditions.</p> Elvis Saputra Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1045 Tue, 01 Aug 2023 00:00:00 +0000 Slope Stability Analysis of Alterated Dasit Rock on Ponorogo Pacitan Road Using Hoek-Brown Failure Criteria https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1058 Retno Puspa Rini, Arief Rachmansyah, Eko Andi Suryo Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1058 Tue, 01 Aug 2023 00:00:00 +0000 Pemodelan Estimasi Kerusakan Jalan Metode Markov https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1094 <p>Roads with damaged conditions can cause traffic accidents and hinder society's economic and social progress. Roads that are left hurt and no repairs will further worsen the condition of these roads. For this reason, it is necessary to analyze the modeling of estimated road damage, which is needed to get an informed picture of future road pavement changes. This study aims to predict road conditions for five years, with the research location being on six roads in Malang Regency. This research method uses interviews and secondary data collection using Markov chain analysis. The method used in this study is the Markov Chain method, which is a method that studies the properties of a variable in the present based on its past properties to determine the properties of these variables in the future. The results of modeling road damage are when road repairs are not carried out, and the injury worsens yearly. On the roads studied, road damage increased from year 0 to year 1, and there were many increases ranging from 2% -7%, and for years 1 to 5, there was an increase of 1%. The conclusion of this study is that road damage is increasing because there is no repair at all, so more funds are needed for road repair costs.</p> Rindah Intansari Mukti, Ludfi Djakfar, M. Zainul Arifin Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1094 Tue, 01 Aug 2023 00:00:00 +0000 Percepatan Proses Konsolidasi Tanah Lempung Dengan Aplikasi Tekanan Vakum dan Drainase Vertikal https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1104 <p>This paper presents the performance of PVD and vacuum consolidation as ground improvement method at the construction of Kayu Agung – Palembang Toll Road. The analysis was based on observation data collected between STA 00+000 and STA 09+000. The PVD was installed to a depth where the conus resistance of 80 kPa was achieved. Thus, the length of PVD varies from 5 to 13 m while the actual depth of clay deposit could reach 20 m. As many as 42 settlement plate data were collected and analyzed using Asaoka method to obtain the predicted final settlement, the coefficient of consolidation and the time to reach 90% degree of consolidation. The results were compared with the duration of vacuum consolidation application and the recorded settlement when the vacuum pressure was stopped i.e., when settlement plate recorded no differential settlement in three readings. The duration of vacuum consolidation application generally longer than the t90 predicted by the method and the actual settlement was larger than the predicted final settlement. This study concluded that the variation of the t90 and the magnitude of settlement at t90 have close relationship with the length of PVD and the condition of the soil layer.</p> arhab, Nurly Gofar Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1104 Tue, 01 Aug 2023 00:00:00 +0000 Pemodelan Rain-On-Grid Untuk Kasus Banjir pada Polder Pluit, Jakarta https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1110 <p>Jakarta flood occurs almost every year, one of the reasons is the rapid development of its urban areas. Generally, Jakarta is categorized as a flat area, of which some locations are lower than the mean sea level, for example Pluit Polder area, thus being prone to flood. In this study, the rain-on-grid modeling with HEC-RAS software is carried out to determine the parts of the Pluit Polder that are still inundated so that better mitigation strategies can be achieved. The modeling results show that there are still inundated areas around the Pluit Polder ranging from 0.25 m to 2.75 m.</p> Riksa Nugraha Utama, Bobby Minola Ginting, Segel Ginting Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1110 Tue, 01 Aug 2023 00:00:00 +0000 Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus: Rekonstruksi Jalan Kabupaten Kutai Kartanegara) https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1111 <p>This research aims to describe the effect of changing control of the reconstruction on Sangasanga-Dondang road, Kutai Kartanegara Regency that have an impact on the time and cost. The length of the road is ± 18.02 km, starting from the intersection of three Sanga Sanga sub-districts and ending at the Dondang Bridge. The road often receives traffic loads from light vehicles and heavy vehicles. This disrupted the stability of the road structure so that some of the road segments experienced structural damage.This research used Earned Value Analysis (EVA), this method used three paramaters, namely Planned Value (PV), Earned Value (EV), and Actual Cost (AC). Based on analysis that had been done when a deviation occurs at estimate the project completion time for 36 weeks. From the parameters, the result obtained were earned value analysis was carried out in 2 weeks with BCWS value of Rp. 73,628,055.56, BCWP value of Rp. 214,691,666.67, and the ACWP value is Rp. 15,099,335,843.68.</p> Dharwati P. Sari, Bernardo S. Salasa Copyright (c) 2023 Rekayasa Sipil http://creativecommons.org/licenses/by-nc/4.0 https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1111 Tue, 01 Aug 2023 00:00:00 +0000