PERENCANAAN ULANG ANGGARAN BIAYA DAN WAKTU PELAKSANAAN GEDUNG PERKULIAHAN DENGAN MENGGUNAKAN METODE BIM

Authors

  • Rizky Ilham Mardhani UNIVERSITAS JEMBER
  • Anik Ratnaningsih UNIVERSITAS JEMBER
  • Syamsul Arifin UNIVERSITAS JEMBER

DOI:

https://doi.org/10.21776/ub.rekayasasipil.2022.016.02.3

Keywords:

modeling, planning, BIM, cost, tIme

Abstract

The speed of completing all stages of the project will cause major complications in the construction management system. The BIM method can integrate all projects that can save costs and time so that it is effective and makes it easier to coordinate in order to streamline the project. The purpose of this study is the planning of a 7-story economic and business building at the University of Jember using BIM application and steps to mmodel the building using a cost and time budget. In this research, the stages in structure modeling using BIM aids, the results, the results of reinforcement modeling and the required budget plan are Rp. 9,400.450.878.04 the time required is 189 days or 6 months 9 days.

References

Anwar, Z., Rahmat. & Ayu, E. S. Perencanaan Penjadwalan Proyek Dengan Penerapan Building Information Modeling (Bim) Studi Kasus Pembangunan Gedung Rumah Susun Sewa Tingkat Tinggi Di Kota Jakarta Selatan. Abstract Of Undergraduate Research, 2(2). 2019.

DS, K. K. Aplikasi building informasi modeling (Bim) Tekla Structure pada konstruksi atap dome Gedung Olahraga Utp Surakarta. Juteks - Jurnal Teknik Sipil, 1(2), 2018. 273-281.

Minawati, R., Chandra, H. P. & Nugraha, P. Manfaat Penggunaan Software Tekla Building Information Modeling (Bim) pada Proyek Design-Build . Dimensi Utama Teknik Sipil, 4(2), 2017. 8-15.

Nofiyanto, A., Sukrawa, M. & Putera, A. A. Perencanaan Struktur Stadion Menggunakan Integrasi Tekla Structure Dan Sap2000 . Jurnal Ilmiah Teknik Sipil, 17(2), 2013. 139-144.

Ramadiaprani, R. Aplikasi Building Information Modeling (Bim) Menggunakan Software Tekla Structures 17 Pada Konstruksi Gedung Kuliah Tiga Lantai Fahutan Ipb, Bogor . Institut Pertanian Bogor. 2012.

Sompie, F. N., Walangitan, D. R. O. & Malingkas, G. Y. Aplikasi Microsoft Project Dalam Pengendalian Waktu Pelaksanaan Pekerjaan Proyek . Jurnal Sipil Statik, 1(8), 2013 . 543-548.

Wartinah., Tilaar, T. A. M. & Yunus, R. M. Penjadwalan Proyek Pembangunan Gedung Research Centre Universitas Tadulako Dengan Menggunakan Microsoft Project . Infrastruktur, 1(3), 2013. 23-30.

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 28 Tahun 2016. Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. 01 Agustus 2016. Berita Negara Republik Indonesia Tahun 2016 Nomor 1166. Jakarta.

Unas, S. E, Hasyim M. H, & Negara K. P. Antisipasi Keterlambatan Proyek Menggunakan Metode What If Diterapkan pada Microsoft Project. Jurnal Rekayasa Sipil, 8(3). 2014. 192-197.

Undang-Undang Republik Indonesia Nomor 28 Tahun 2002. Bangunan Gedung. 16 Desember 2002. Lembaran Negara Republik Indonesia Tahun 2002 Nomor 134. Jakarta.

Downloads

Published

2022-06-30