Penentuan Prioritas Kegiatan Perawatan Bangunan Gedung Sekolah Negeri Di Kota Blitar
DOI:
https://doi.org/10.21776/ub.rekayasasipil/2017.011.03.9Keywords:
Analytical Hierarchy Process (AHP), Damage Level Building, Index Condition BuildingAbstract
Performance of a building construction will decrease with increase life service of the structure. To maintain the performance building in order to remain functioning properly it is necessary to repair the damaged building components. The purpose of this study is to get an assessment the physical condition of the building and analyze damage level of school structure in Blitar City, and get the order to maintenance of elementary school structures in Blitar City. Weight of structure criteria assessed by the building expert and analyzed with Analytical Hierarchy Process (AHP) method, then the result of the weight is multiplied by the physical condition index obtained from the observation. Assessment of physical condition index of elementary school structure in Blitar city is 69.34%, it can be interpreted that the structure is in deterioration or damage but does not affect the overall structure of the building.Downloads
Published
2018-02-09
How to Cite
Ismanto, I., Harimurti, H., & Zaika, Y. (2018). Penentuan Prioritas Kegiatan Perawatan Bangunan Gedung Sekolah Negeri Di Kota Blitar. Rekayasa Sipil, 11(3), pp.236–244. https://doi.org/10.21776/ub.rekayasasipil/2017.011.03.9
Issue
Section
Articles
License
Copyright (c) 2018 Rekayasa Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This journal is licensed under a Creative Commons Attribution 4.0 International License